{"id":16625,"date":"2024-11-14T10:46:36","date_gmt":"2024-11-14T06:46:36","guid":{"rendered":"https:\/\/sandogroup.ge\/\u10db\u10d0\u10e6\u10d0\u10d6\u10d8\u10d0\/uncategorized\/xperio-super-finish\/"},"modified":"2024-11-14T10:46:36","modified_gmt":"2024-11-14T06:46:36","slug":"xperio-super-finish","status":"publish","type":"product","link":"https:\/\/sandogroup.ge\/en\/shop\/%e1%83%a4%e1%83%98%e1%83%97%e1%83%ae%e1%83%94%e1%83%91%e1%83%98\/xperio-super-finish\/","title":{"rendered":"XPERIO Super Finish"},"content":{"rendered":"<p><strong>Purpose<\/strong>: Final leveling of cement and plaster surfaces before applying paint, wallpaper, or decorative coatings.<\/p>\n<p><strong>Surface Preparation:<\/strong> The surface to be treated must be dry and free from dust and dirt. It should be primed with a special primer.<\/p>\n<p><strong>Application:<\/strong> Stir the putty well, apply and level it using a wide putty knife in a 2 mm layer. The next layer can be applied after the previous one has dried (approximate drying time: 6 hours). Drying time depends on air temperature and humidity. The product should be applied at a temperature of +10\u00b0C to +30\u00b0C, and relative humidity of 60\u201380%. After full drying (24 hours), the surface can be sanded and primed.<\/p>\n<p><strong>Composition:<\/strong> Acrylic polymer, marble, auxiliary additives, thickener, water.<\/p>\n<p><strong>Safety Measures:<\/strong> Work in a well-ventilated area using gloves, goggles, a respirator, and protective clothing. In case of contact with eyes or skin, rinse with water. Keep out of reach of children.<\/p>\n<p><strong>Storage:<\/strong> Store in a tightly sealed container at a temperature of -5\u00b0C to +30\u00b0C, protected from sunlight and heat sources, in a dark place.<\/p>\n<p><strong>Disposal:<\/strong> Do not dispose of leftover putty or empty containers in water bodies, sewers, or soil. Empty containers can be disposed of with household waste.<br \/>\nThe product does not require mandatory certification.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Purpose: Final leveling of cement and plaster surfaces before applying paint, wallpaper, or decorative coatings. Surface Preparation: The surface to<\/p>\n","protected":false},"featured_media":15626,"template":"","meta":[],"product_brand":[],"product_cat":[672,717],"product_tag":[],"class_list":["post-16625","product","type-product","status-publish","has-post-thumbnail","product_cat-672","product_cat-wall-putty","first","instock","sale","taxable","shipping-taxable","purchasable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/sandogroup.ge\/en\/wp-json\/wp\/v2\/product\/16625","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sandogroup.ge\/en\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/sandogroup.ge\/en\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sandogroup.ge\/en\/wp-json\/wp\/v2\/media\/15626"}],"wp:attachment":[{"href":"https:\/\/sandogroup.ge\/en\/wp-json\/wp\/v2\/media?parent=16625"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/sandogroup.ge\/en\/wp-json\/wp\/v2\/product_brand?post=16625"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/sandogroup.ge\/en\/wp-json\/wp\/v2\/product_cat?post=16625"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/sandogroup.ge\/en\/wp-json\/wp\/v2\/product_tag?post=16625"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}